A backup power plan starts with three honest questions: what has to stay on, how big a project you're ready to take on, and which goal matters most. This free planner turns your answers into a short, ordered plan. Start with a load list that shows planning ranges for running and starting watts, then pick a budget tier and a goal. Each step links to the guide on this site that explains it, from sizing and transfer switches to outdoor placement and installer quotes. There's no signup and no email. Your choices stay in your browser, and you can print the plan, your load worksheet and an outage checklist. It's a starting point for your own nameplates and local quotes, not a product pick.
A permitted inlet with interlock or a manual transfer switch, or standby with an ATS
“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source
The interactive planner needs JavaScript. Everything it builds is still on this page: the load list below shows planning ranges, the example plans walk through three common setups, and every plan at a glance lists all twelve budget and goal combinations.
Loads
Budget
Goal
Plan
Example plans
Three common setups, built the same way the planner builds yours. Every step links to the guide it comes from.
Example plan
Essentials on the smallest spend
Budget: Smallest spend: cords and a portable or a power station · Goal: Keep the essentials on
The 9 steps
List your must-run loads on the critical load worksheet: fridge, a lamp or two, router or modem, phone chargers. Mark each one plug-in or hardwired.
If outdoor exhaust is not allowed where you live, compare a power station instead of a gas portable.
Published cost tier“Power station: appliance-like purchase; no transfer switch; you are done when the carton is open.” Source: Battery backup vs generator
Start with what the budget allows: cover the must-run list now, and note which loads would need a transfer path later so the next step is already planned.
Plan a permitted inlet with interlock or a manual transfer switch so the hardwired well can be fed legally.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an interlock lets you change which breakers you feed as priorities shift, within the generator's rating.
Ask for bids in the larger tier. Even then, not every appliance runs at once unless it is sized and managed.
Published cost tier“Larger whole-home-ish standby · More circuits or a whole-panel / managed whole-home conversation · Still not every appliance at once unless sized and managed; bigger site and electrical scope” Source: Standby generator installed cost
Go through the cost drivers that move the bill: equipment, pad, ATS, fuel work, permits and electrical labor.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an essential-circuit standby sized to your worksheet is a sound start, and a larger tier with load management can be chosen later.
If outdoor exhaust is not allowed where you live, compare a power station instead of a gas portable.
Published cost tier“Power station: appliance-like purchase; no transfer switch; you are done when the carton is open.” Source: Battery backup vs generator
Start with what the budget allows: cover the must-run list now, and note which loads would need a transfer path later so the next step is already planned.
To keep the well on, the next step up is a permitted inlet with interlock or a manual transfer switch. See the middle-budget plan for water.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
Start with what the budget allows: cover the must-run list now, and note which loads would need a transfer path later so the next step is already planned.
To keep heat on, the next step up is a permitted inlet with interlock or a manual transfer switch. See the middle-budget plan for heat.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
Start with what the budget allows: cover the must-run list now, and note which loads would need a transfer path later so the next step is already planned.
If you still want most of the house on, compare the standby path and see the largest-budget plan.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows: cover the must-run list now, and note which loads would need a transfer path later so the next step is already planned.
Choose between an interlock on your main panel and a manual transfer switch with a fixed circuit list. Both need a licensed electrician and usually a permit.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an interlock lets you change which breakers you feed as priorities shift, within the generator's rating.
Plan a permitted inlet with interlock or a manual transfer switch so the hardwired well can be fed legally.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an interlock lets you change which breakers you feed as priorities shift, within the generator's rating.
Plan a permitted inlet with interlock or a manual transfer switch so the furnace circuit can be fed legally.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an interlock lets you change which breakers you feed as priorities shift, within the generator's rating.
Middle: a permitted inlet with interlock or a manual transfer switch · Run most of the house
This goal needs more than this budget band covers. The plan below says where the limit is and what the next band adds.
Know the limit first: an interlock lets you pick breakers within the generator's rating, but turning on every breaker still overloads a mid-size portable.
Published cost tier“Inlet + interlock or manual transfer tier: hardware plus electrician labor, usually a permit and inspection. A small electrical project, not a warehouse impulse buy.” Source: Transfer switch vs interlock
If you need most of the house on without someone switching it over, compare the standby path and see the largest-budget plan.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an interlock lets you change which breakers you feed as priorities shift, within the generator's rating.
Give every installer the same bid lines: equipment, pad, ATS, fuel work, permits, electrical labor, commissioning.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an essential-circuit standby sized to your worksheet is a sound start, and a larger tier with load management can be chosen later.
Read the larger-home-with-a-well scenario: the well and sump go on the transfer plan, with load management so motors don't start together.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an essential-circuit standby sized to your worksheet is a sound start, and a larger tier with load management can be chosen later.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an essential-circuit standby sized to your worksheet is a sound start, and a larger tier with load management can be chosen later.
Ask for bids in the larger tier. Even then, not every appliance runs at once unless it is sized and managed.
Published cost tier“Larger whole-home-ish standby · More circuits or a whole-panel / managed whole-home conversation · Still not every appliance at once unless sized and managed; bigger site and electrical scope” Source: Standby generator installed cost
Go through the cost drivers that move the bill: equipment, pad, ATS, fuel work, permits and electrical labor.
Published cost tier“Standby + ATS tier: equipment, pad, fuel work, ATS, permit, inspection, commissioning. A small construction project with longer lead time.” Source: Transfer switch vs interlock
Start with what the budget allows and leave room to grow: an essential-circuit standby sized to your worksheet is a sound start, and a larger tier with load management can be chosen later.
Every plan comes from guides already published on BuyAGenerator.com. We don't add brands, models or prices, and no step is paid for.
Budget bands are scope, not dollars. They are the three cost tiers our transfer switch guide uses: cords, an inlet with interlock or manual transfer switch, and standby with an automatic transfer switch. Labor, permits, fuel work and setbacks vary too much by area for a national average to help, so your local quotes fill in the dollars.
Goals follow the layers on our critical load worksheet: communications and cold food first, then one zone of heat or water, and everything else last.
Every plan follows the same order: list your loads, rank them, size from nameplates, choose a legal transfer path, start with what the budget allows and leave room to grow, place the generator outdoors with CO alarms, then work through the outage checklist and keep up maintenance.
When a goal doesn't fit a budget band, such as a hardwired well pump on extension cords, the plan says so and points to the next band. It never suggests a workaround.
The safety step stays free of products. It links only to our placement and carbon monoxide guide.
Where the numbers come from
Watts and surge: planning ranges from our critical load worksheet; the planning peak is the running total plus the single largest extra start.
Fridge: about 64 W average, from ENERGY STAR’s 560 kWh a year for a certified bottom-freezer model, not a flat guess.
Battery runtime: usable watt-hours × 0.90 ÷ average watts. For about 124 W: 2,000 Wh ≈ 14.5 hours, 5,000 Wh ≈ 36.3 hours.
Cost: published scope tiers, not dollars.
Full math: watts, surge, fridge duty cycle and battery runtime
Watts. Running and starting figures in the load list are the planning ranges in our critical load worksheet. They are not lab measurements or model claims. Your nameplate wins: watts = volts × amps.
Planning peak (surge). We add the running watts of everything that may be on together, then add only the largest extra start (starting minus running), as our sizing guide does. Two motors starting in the same minute raise the peak, so stagger them.
Fridge average (duty cycle). A fridge cycles, so we don't use a flat figure. We take the yearly energy on the yellow EnergyGuide label and divide by the hours in a year: 560 kWh × 1,000 ÷ 8,760 h = 63.9 W, about 64 W. ENERGY STAR lists about 360 kWh a year for a certified top-freezer model, about 560 kWh for a bottom-freezer model and about 630 kWh for a side-by-side (ENERGY STAR quick reference guide). Against a 180 W running plate from our sizing guide example, 63.9 W means the compressor runs about 36% of the time, roughly 21 minutes an hour. Use your own label: kWh a year ÷ 8.76 = average watts. An outage day with the doors kept shut may run less; a warm kitchen or frequent opening runs more.
Battery runtime. Usable watt-hours × 0.90 ÷ average watts ≈ hours. The 0.90 is the about-10% inverter and wiring loss our battery vs generator guide, power station guide and hybrid solar guide use. Capacity means usable watt-hours after the pack's depth-of-discharge limit, which is often less than the number on the box. The example uses 2,000 Wh and 5,000 Wh, sizes our guides already show: 2,000 Wh × 0.90 ÷ 123.9 W ≈ 14.5 hours; 5,000 Wh × 0.90 ÷ 123.9 W ≈ 36.3 hours.
Cost. We publish cost as scope tiers, not dollars. Your local quotes fill in the dollars.
Runtime example: the same three loads on two battery sizes
Example A refrigerator (about 64 W average), a router and modem (20 W) and LED lights in two rooms (40 W): about 124 W together. Battery sizes are generic usable capacities, not models.
Runtime of the example loads on two usable battery capacities
Written and reviewed by Gregg Jahn. See our editorial policy. This is educational planning, not electrical or legal advice; a licensed electrician decides what is safe for your panel.
Plan link: https://www.buyagenerator.com/backup-power-plan-builder.html
Educational planning only. Size from your own nameplates and get local quotes. By Gregg Jahn.