Quick answer
A standard grid-tied solar system shuts off when the utility goes down, even in full sun. That is on purpose. The inverter is required to stop sending power into a dead grid so a line that looks safe is not still energized. Backup takes two extra pieces: a listed way to isolate your house, or a critical-load panel, from the utility — usually a hybrid inverter with an automatic transfer or a backup gateway — and a source that can form that isolated power, usually batteries, sometimes a generator, often both. Solar can recharge the battery after the system has isolated. The array is the recharge path, not backup by itself.
If you already have grid-tied solar and you want lights, a fridge, or a well to keep running in an outage, adding batteries or a hybrid inverter is a design change. It usually means an amended interconnection agreement and a new or updated permit, not a silent add-on. Start with a critical load list and the hours you actually need. Then decide whether a battery, a generator on a proper transfer switch or interlock, or both, does the job.
This is the hybrid / existing-system guide in our DIY solar series. It is not a wiring manual, a permit-skip, or a payback claim.
Why a standard grid-tie system shuts off in an outage
In most homes with a typical grid-tied inverter and no batteries, the honest answer to “will I have power if the grid goes down in the middle of the day?” is no.
Grid-tied inverters are built to follow the utility. When they sense that the grid has dropped, they shut down. The usual name for this behavior is anti-islanding: the system is not allowed to keep a slice of the neighborhood energized on its own. That rule exists to protect utility workers and anyone else who might touch a line they believe is dead. It is a safety function, not a defect.
So a roof full of panels, in bright midday sun, will not run the house by itself if the only inverter you have is a standard grid-tied unit. The panels can still offset your bill when the grid is up. They are not backup power on their own.
A hybrid system adds the two pieces that backup requires:
- Isolation from the grid. A listed hybrid inverter, automatic transfer, or backup gateway that can separate a protected backup panel — or, in some designs, the whole house — from the utility. The utility side stays dead. The islanded side can stay live.
- A source that can stand up on its own. Batteries, a generator, or both. Once that island is formed, the array can recharge the battery if the hybrid or battery inverter is designed to let the solar come back online. Until isolation happens, a standard grid-tied inverter stays off.
This page is the deeper look at that hybrid path. For a side-by-side of off-grid, grid-tie, and hybrid as three different jobs, see Does grid-tied solar work in a power outage?. For batteries versus generators as backup, see battery backup vs generator.
Whole-home backup vs a critical-loads panel
“Battery backup” is not automatically the whole house. Many hybrid systems back up a critical-loads panel (sometimes called a backup subpanel): selected circuits that were moved or isolated so they can run from the battery. A smaller battery covers more hours when the list is short. A whole-home design uses a backup gateway or a service-rated transfer at the main panel so most circuits are available, often with automatic load shedding for large loads such as central air, an EV charger, or an electric range. That takes a larger inverter (continuous watts and surge) and more usable kilowatt-hours. It still may not mean “everything at once.”
Start with the critical load worksheet either way. Write down what must stay on, the running watts, the starting (surge) watts for motors, and how many hours you care about. A fridge, a modem, and a couple of rooms of lights are a different job from a well pump or a furnace blower, and a space heater is a different job again. Nameplates and a meter beat a carton claim. For motor surge, including wells, use the same load list you would give a generator sizing worksheet.
Rules of thumb that hold up:
- If the must-run list is a lean essentials panel, a modest battery can cover a night, and the array can help refill it the next day if the system has already isolated.
- If the must-run list includes heat strips, a well that cycles hard, or “keep the whole panel as usual,” the battery has to get much larger — or a generator has to be in the plan — or the list has to get shorter.
- Whole-home is a size and install decision, not a marketing label. Ask what the inverter can actually carry, what it will shed, and how many usable kilowatt-hours are on the wall.
Adding batteries or a hybrid inverter to solar you already have
This is one of the questions owners actually ask, often as “just bought a house with solar — should I, and how do I, add batteries?” and “adding battery and hybrid inverter to existing grid-tied solar.” The short version: often yes if you want outage coverage, because many existing grid-tied systems shut down when the grid does. How you add storage depends on the inverter that is already there. It is a design and interconnection change, not a weekend accessory.
Two common coupling approaches, at a homeowner level (not a wiring how-to):
DC-coupled. The array lands on a hybrid inverter’s PV inputs, or on a charge controller that shares a DC bus with the battery. Solar can charge the battery without being converted to AC first. This is a common layout for a new hybrid system. As a retrofit, it often means replacing the existing grid-tied inverter and confirming that string voltage, current, and temperature limits still fit the new inverter’s inputs. Compatibility is a site-specific check against the array and the equipment manual, done with a licensed electrician — not a guess from a catalog photo.
AC-coupled. The existing grid-tied inverter stays in place and keeps making AC. A battery inverter or backup gateway is added on the AC side. During an outage, the battery inverter forms a protected island so the existing solar inverter can, if it is compatible, come back online and help charge the battery. Compatibility is not automatic. The two sides have to be designed to work together (often by the battery inverter shifting frequency to curtail the existing solar when the battery is full). Common existing platforms, such as Enphase microinverters or a SolarEdge string inverter, are often discussed in this kind of retrofit. Naming them here is only to describe a situation you may already have. It is not a supplier recommendation, and it is not a promise that any particular gateway will work with the unit on your wall. That check belongs to the installer, the equipment manuals, and the utility’s approved-equipment list.
In either path, plan on all of the following before you buy the hardware or turn anything on:
- A permit (often a new or amended electrical permit) and a licensed electrician and/or inspection.
- A utility interconnection amendment when you add a battery, a hybrid inverter, or a backup gateway to a system that already has approval. That amendment is not optional. A “zero-export” setting is not a substitute for approval, and it does not mean the utility does not need to know.
- Listed, labeled equipment the AHJ and the utility will accept. For a grid-interactive inverter, that usually means a UL 1741 listing, and often UL 1741 SB (or IEEE 1547) where the utility requires it. For the battery and the energy storage system, see the listing notes below.
A later guide in this series will walk the lawful permit and interconnection path as a checklist. This page does not explain how to skip those steps.
Sizing the battery for outage hours
Size the battery from usable watt-hours and the hours you want, not from a carton “whole home” claim. Usable capacity is often less than the nameplate kilowatt-hours on the box. Use the listed usable figure, and respect the depth-of-discharge and temperature limits in the manual.
The formula is straightforward:
Average watts on the plan × hours without recharge = watt-hours needed, before losses.
Then divide by a labeled efficiency assumption so the bank is not sized on a perfect inverter. In the example below, 10% inverter-and-wiring loss is a planning assumption, not a measured result for your house (watt-hours needed ÷ 0.90 ≈ usable watt-hours to plan for).
Worked example — a critical-load panel for 12 or 24 hours
The loads and watt-hours below are illustrative planning examples, in the same spirit as our critical load worksheet. They are not a product pick, a national average, or a promise of runtime. Use your own nameplates and a meter where you can.
Slice A — fridge, modem, and two rooms of lights (averages while those loads are “on the plan,” not nameplate running watts):
| Load | Assumed average watts | Notes |
|---|---|---|
| Refrigerator (duty-cycled) | 60 | Compressors cycle; average is far below nameplate |
| Modem + router | 20 | Always on |
| LED lights (two rooms) | 40 | Not the whole house |
| Combined average draw | 120 W | Before inverter loss |
If you want those loads for about 12 hours with no sun, a rough planning energy need is 120 W × 12 h = 1,440 Wh. After the 10% loss assumption, 1,440 Wh ÷ 0.90 ≈ 1,600 Wh of usable battery. For 24 hours with no sun: 120 W × 24 h = 2,880 Wh, and 2,880 Wh ÷ 0.90 ≈ 3,200 Wh usable. That is a planning sketch, not a shopping cart.
Slice B — the same list, plus a furnace blower (also an assumed example). A furnace blower is often several hundred watts when it runs. Here we assume 400 W while it is on and a 25% duty cycle, for an average of 100 W on the plan. Combined average draw becomes 120 + 100 = 220 W. For 12 hours with no sun: 220 W × 12 h = 2,640 Wh, and 2,640 Wh ÷ 0.90 ≈ 2,930 Wh usable. For 24 hours: 220 W × 24 h = 5,280 Wh, and 5,280 Wh ÷ 0.90 ≈ 5,870 Wh usable.
A well pump or a space heater changes the picture again. Those are surge-and-energy problems. A 1,500 W space heater added to Slice A is 1,620 W while it runs; a 2,000 Wh usable bank would last roughly 2,000 ÷ 1,620 ≈ 1.2 hours at that draw, before you even argue about duty cycle. Run motors and heat through the generator sizing guide and the critical-load worksheet before you decide a battery is enough. If the honest list will not fit the hours you want, shorten the list, enlarge the bank, or add a generator — or some mix of the three.
Recharge, once the system has isolated. After a hybrid inverter or backup gateway has formed the island, the array can help refill the battery when the sun is up. How much it can refill depends on array size, weather, season, and where you are. Check production with a tool such as NREL PVWatts for the actual location and array, rather than guessing a daily figure. Treat solar recharge as real but seasonal — a stretch of poor sun is why many hybrid plans also include a generator.
This example is about backup hours, not about whether solar is “worth it” on the monthly bill. Export credits, tariffs, and incentives vary too much for a made-up payback to help you. For context only, the U.S. Energy Information Administration’s Electric Power Monthly, Table 5.6.A, shows a U.S. residential average of 18.16 cents per kWh for August 2026, and a North Carolina residential average of 14.95 cents per kWh in the same table (preliminary; released October 23, 2026; next release scheduled for November 24, 2026; table re-checked November 20, 2026). A state or national average is a starting point, not your bill; your published tariff wins when you have it. A later guide in this series will walk payback with PVWatts production, EIA or that tariff, and a fresh check of the federal Residential Clean Energy Credit (25D). As of November 20, 2026 (publish-time re-check of the IRS page), that credit is not available for installations completed after December 31, 2025. Unused credit from a qualifying 2025 installation may still be carried forward. Do not reuse “30% off” math for a 2026 install. See battery backup vs generator for the 2026 incentive reality.
Two ways to apply the same math:
- A new hybrid with a critical-loads panel. Build the must-run list, size usable watt-hours for the hours you want, pick a listed hybrid inverter that can carry the running and surge watts on that panel, and go through permit, inspection, and interconnection before turn-on.
- A retrofit on a system you already have. Do the same load math, then decide whether an AC-coupled battery inverter / gateway or a DC-coupled hybrid replacement fits the inverter that is already on the wall. Budget time for an interconnection amendment and a new or updated permit. Do not assume the existing approval covers the battery.
Decision table
Use this as a chooser, not as a scorecard. “Best” depends on which loads have to stay on, how long, and what you are willing to permit and interconnect.
| Question | Critical-load hybrid (grid-tie + battery) | Whole-home hybrid (grid-tie + battery) | Generator with a transfer switch or interlock | Hybrid battery and a generator together |
|---|---|---|---|---|
| What stays on in an outage? | Only the circuits on the backup or critical-load panel, if the system is designed and listed to island | Most house circuits, often with automatic shedding of large loads, if the inverter and bank are sized for it | The circuits on the transfer device — a selected panel or, with some standby installs, most of the house | The battery can cover the short, quiet hours; the generator can take a long stretch or the heavy loads |
| Does existing grid-tied solar stay on? | Only after the hybrid or gateway has isolated, and only if the solar is set up to work on that island | Same rule: isolation first, then solar as a recharge path | A standard grid-tied inverter still shuts down unless the whole plan is designed so solar and the generator can work together | That combined plan is a later guide in this series; it is not something to improvise |
| Main job | Outage coverage for a short must-run list, plus bill offset when the grid is up | Outage coverage for a much larger slice of the house, plus bill offset when the grid is up | Hours or days of fuel-powered backup, including motors that would empty a small battery | Quiet coverage for short outages, with fuel as the reserve for a long stretch of poor sun |
| Permit and utility approval | Yes: permit, licensed electrician and/or inspection, and interconnection approval — plus an amendment if you add a battery or gateway to a system that already exists | Yes, same approvals, usually with a larger equipment and load-shed review | An electrical permit for the transfer equipment is still typical. This is not a PV interconnection by itself, and it is not a do-it-yourself backfeed | Both sets of rules apply. The transfer path still has to be listed and inspected |
| Typical next step | A critical-load list and usable-kWh math (the example above) | The same list, plus an honest whole-home / load-shed conversation with the electrician or installer | Transfer switch vs interlock, then standby installed cost or the installer quote checklist if a standby unit is in view | Size the battery for the short stretch, then plan when the generator starts and how it is connected |
A portable power station can still cover a few quiet hours of plug-in loads without any of these house-wired paths. It is not a substitute for a permitted hybrid or a transfer-switched generator.
How this compares with a generator — and using both
A generator on a proper transfer switch or interlock is often the cheaper way to cover a long outage or a hard motor load. It runs as long as you can fuel it, or as long as a natural-gas service holds. It is also louder, it is outdoor equipment, and a portable unit has carbon monoxide rules that do not go away because you also have solar. See generator placement and carbon monoxide if a portable generator is in the plan. Do not backfeed the house through a dryer outlet or a “suicide” cord. That is unsafe, and it is not a path we teach.
A hybrid battery is quiet, it can start automatically if it is designed to, and it can use the array as a recharge path after isolation. It is a reservoir. When the usable watt-hours are gone, it is gone, until the sun or another listed source refills it.
Using both is often the adult plan, not a compromise. The battery covers a short outage and the overnight hours. The generator covers a multi-day stretch or the loads that would empty the bank in an hour. Some hybrid inverters have a listed generator input so the engine can recharge the battery; that only works if the equipment is designed and listed for it, and if the transfer path is done correctly. A later guide in this series covers solar and a generator as one plan, including when the generator starts and how that pairs with winter fuel and the maintenance calendar. For a standby generator’s cost and quote process, see standby generator installed cost and the installer quote checklist. For the broader runtime and 2026 incentive comparison, see battery backup vs generator.
A warning, not a shortcut
Some listings and forum posts describe plug-in or “balcony” inverters, or a grid-tied or hybrid setup with no interconnection agreement, as a way to add backup or to “start small.” That is not a path we teach.
A device that can send power back through a wall outlet, or that keeps running when the grid is down without a listed isolation device, can energize house wiring and, in the worst case, a utility line. That is a safety problem (anti-islanding is there for a reason), a permit and interconnection problem, and potentially an insurance problem. “Zero export so the utility won’t know” is not a plan. Rules vary by utility and jurisdiction. If that idea is on your list, set it down. The lawful versions of adding backup are: a portable power station that does not backfeed the panel; a permitted, inspected, interconnected hybrid or retrofit; and, if a generator is in the plan, a proper transfer switch or interlock.
Safety and code
Requirements vary by jurisdiction and by the authority having jurisdiction (AHJ). This page is educational. It is not legal, code, or insurance advice.
- Grid-tie and hybrid systems that can export or interconnect need a permit, a licensed electrician and/or inspection, and utility interconnection approval before they are turned on. Adding a battery, a hybrid inverter, or a backup gateway to a system you already have usually means an amended interconnection, not a silent add-on. Do not skip the permit. Do not treat “zero export” or a small system as a way to avoid the utility.
- Rooftop PV is subject to rapid-shutdown rules under the National Electrical Code edition your AHJ enforces. Use listed, labeled disconnects, properly rated for the circuit (including DC where the circuit is DC).
- Batteries have their own placement, temperature, and fire-safety rules, and those rules vary. Follow the listing, the installation manual, and the AHJ. Some jurisdictions restrict where a lithium energy storage system may be installed (for example, living space versus a garage or a dedicated utility room), and they may ask for clearances, ventilation or detection, and a UL 9540 system listing, sometimes with a UL 9540A fire-test report. Outdoor installation is allowed only when the specific equipment is listed and marked for that use. Charging in the cold has its own limits; follow the manual. A later guide in this series covers labels versus directory listings in more depth. Do not install unlisted batteries after an inspection as a workaround.
- For the standards we check, see “How we pick products” below. In short: inverters, UL 1741, plus IEEE 1547 or UL 1741 SB for grid-tie; energy storage systems, UL 9540, and a UL 9540A test report when required (9540A is a test method, not a listing); batteries, UL 1973.
- If a generator is in the plan, keep portable units outdoors and away from openings, and use a proper transfer path. See transfer switch vs interlock and generator placement and carbon monoxide.
How we pick products
We show UL-, ETL- (Intertek), or CSA-listed equipment first. Those labs are OSHA-recognized NRTLs, and a listing to the same UL standard counts equally regardless of which of them issued it. Country of origin does not change the rule: a listed import is listed; an unlisted one is not. We verify the exact model in UL Product iQ, the Intertek directory, or a certificate — not from a seller’s product page. If we show a product that is not listed, we say so next to it.
This guide does not name product models. No model will be named until that listing has been verified by hand.
If we later show a product that is not listed, it will carry this note immediately beside it:
Where to look
Supplier links on this page are ordinary editorial links. We do not earn a commission if you buy, and no brand paid to be listed. We list suppliers that publish prices, have a documented US support and warranty policy, and meet our independent review bar on the last check date — or we list them with a “Rating not yet confirmed” note when the rating has not been confirmed first-hand. We re-check the list each quarter. If we later sign an affiliate or sponsorship agreement, those links will be labeled on the page and will use rel="sponsored".
These are companies and catalogs, not product recommendations. No models are named here. Any inverter, battery, or energy storage system you actually buy still needs a model-level listing check: UL 1741 (plus IEEE 1547 or UL 1741 SB if it interconnects), UL 9540 and a UL 9540A test report when required, and UL 1973 for the battery.
- Signature Solar — Kit seller with a public US catalog of off-grid and hybrid kits, panels, inverters, batteries, and balance-of-system parts, and US-based support. BBB A+ (accredited); 256 customer reviews on the BBB profile we checked on November 17, 2026. Related to EG4 Electronics (same Sulphur Springs, Texas address and principals on their BBB profiles). We list both because one is a catalog retailer and the other is a component maker; they are not independent alternatives.
- EG4 Electronics — Component maker of inverters, batteries, and energy storage systems, with US support in Sulphur Springs, Texas. BBB A+ (accredited); 4 customer reviews on the BBB profile we checked on November 17, 2026 (a thin review count, which is why we report the number). See the related-company note under Signature Solar. Equipment from this maker is often purchased through that retailer.
- Shop Solar Kits — Kit seller with a public catalog of complete off-grid, hybrid, and backup kits, plus components, and US phone support. BBB A+ (not accredited); 26 customer reviews on the BBB profile we checked on November 17, 2026.
- EnergySage — A marketplace for comparing installer quotes on grid-tie and storage projects, not a parts cart. BBB A- (accredited) on the profile we checked on November 17, 2026. Useful here if you want local installer quotes for a hybrid or a retrofit, rather than a DIY parts list.
Nobody from this site has contacted these companies about this list.
FAQ
These questions are ones homeowners actually ask — several as real thread titles in r/solar, r/SolarDIY, and r/OffGrid. Short answers only; the sections above carry the detail.
Is it true that home solar panel setups connected to the house electrical are useless in a power outage?
A standard grid-tied system will not power the house when the utility is down. That shutdown is anti-islanding, and it is required. The panels are still doing their job on ordinary days. They become backup only if you add isolation and a grid-forming source, usually batteries (a hybrid system), sometimes with a generator.
Just bought a house with solar. Should I, and how do I, add batteries?
Often yes if you want outage coverage, because many existing grid-tied systems shut down when the grid does. Adding batteries or a hybrid inverter is a design change: AC-coupled or DC-coupled, depending on the inverter already on the wall, and usually an interconnection amendment plus a new or updated permit. A generator on a proper transfer device can be a simpler backup while you plan the battery side.
Adding battery and hybrid inverter to existing grid-tied solar — is that AC-coupled or DC-coupled?
Both exist. AC-coupled keeps the existing grid-tied inverter and adds a battery inverter or gateway on the AC side. DC-coupled usually means a hybrid inverter takes over the array’s DC input. Compatibility is not automatic. Have a licensed electrician and the equipment manuals, not a forum thread, make that call — and talk to the utility before you buy.
Do I need to go through interconnection again to add another inverter or a battery?
Usually yes, or at least to amend the agreement you already have. Adding a battery, a hybrid inverter, or a backup gateway is a change the utility and the building department typically have to approve. “Zero export” is not a way around that.
What if I install solar, or add a battery, with no permit?
Don’t. Grid-tie and hybrid work that interconnects with the utility needs a permit, inspection, and interconnection approval. This site covers how to get those approvals, not how to skip them. Requirements vary by jurisdiction.
Will I get in trouble for plugging an inverter into a wall outlet?
We don’t teach that setup. A plug-in or “balcony” inverter that can backfeed a receptacle can energize wiring — and possibly a utility line — in an unsafe way. Use a portable power station that does not backfeed, or a permitted, inspected system.
Once the batteries are no longer the problem, what becomes the weak point?
Usually a long stretch of poor sun, or the cost of enough storage to ride it out. A generator with a sane fuel plan and a proper transfer path is often the next piece. That combined plan is a later guide, and it pairs with our winter generator fuel and maintenance calendar pages.
Battery UL certifications: should the product label have it printed on it? Can the battery live outdoors?
A mark on the label is not enough by itself. We verify the exact model in UL Product iQ, the Intertek directory, or a certificate. For storage, the usual standards are UL 1973 for the battery, UL 9540 for the energy storage system, and UL 9540A as a fire-test method when it is required — not as a listing. Outdoor installation is a listing, manual, and AHJ question, not a default. A later guide in this series takes that in more depth. No model is named here until that directory check is done by hand.
Next step
- Critical load worksheet — build the must-run list and the hours before you size a battery or a generator.
- Generator sizing guide — running vs surge watts, including wells and other motors, whether the source is a generator, a battery, or both.
- Transfer switch vs interlock — the safe path onto house circuits if a generator is in the plan.
- Battery backup vs generator — runtime, install, and the 2026 incentive reality (no expired 30% residential credit).
- Standby generator installed cost and the installer quote checklist — if a standby generator is part of the backup plan.
- Does grid-tied solar work in a power outage? — the series chooser for off-grid vs grid-tie vs hybrid.
- How to size a DIY off-grid solar system — if there is no utility at the site and the job is everyday power, not hybrid backup.
Later in this series: a sourced payback worksheet; permits and interconnection; a worked cabin or workshop example; battery listing and placement; wiring and fusing; solar and a generator as one plan.