Solar • DIY series

Does grid-tied solar work in a power outage?

A standard grid-tie system shuts off in an outage on purpose. Compare off-grid, grid-tie, and hybrid backup paths—without skip-permit advice or made-up payback numbers.

Last updated:

Part of Solar / Battery hub

Quick answer

A standard grid-tied solar system shuts off when the utility goes down, even in full sun. That is on purpose. The inverter is required to stop sending power into a dead grid so a line that looks safe is not still energized. If you want lights, a fridge, or a well to keep running during an outage, you need a system that can isolate from the grid and a source that can form that isolated power — usually batteries, sometimes a generator, often both. Off-grid, grid-tie, and hybrid (grid-tie with battery backup) are different jobs. Start with the job, then size the equipment.

This is the starting guide for our DIY solar series. It helps you choose a path. It is not a wiring manual, a permit-skip, or a payback claim.

Solar panels on a tile roof of a two-story house in a hillside neighborhood, under a clear blue sky.
Rooftop solar on a house. A standard grid-tied array like this shuts off when the utility goes down, unless the system is designed for backup. This is a stock photo used to illustrate a typical residential array. It is not Gregg Jahn’s own system. Photo by Robert So on Pexels, used under the Pexels License (commercial use allowed; attribution is not required, and is included here as a courtesy).

Does grid-tied solar work when the power is out?

In most homes with a typical grid-tied inverter and no batteries, the honest answer is no.

Grid-tied inverters are built to follow the utility. When they sense that the grid has dropped, they shut down. The usual name for this behavior is anti-islanding: the system is not allowed to keep a slice of the neighborhood energized on its own. That rule exists to protect utility workers and anyone else who might touch a line they believe is dead. It is a safety function, not a defect.

So a roof full of panels, in bright midday sun, will not run the house by itself if the only inverter you have is a standard grid-tied unit. The panels are not “useless” as a long-term energy source — they can still offset your bill when the grid is up — but they are not backup power on their own.

Backup takes two extra pieces:

  1. Isolation from the grid — a listed transfer device, backup gateway, or hybrid inverter that can separate your critical loads (or the house) from the utility.
  2. A source that can stand up on its own — batteries, a generator, or both. Solar can recharge those batteries after the system has isolated, but the array is the recharge path, not the thing that creates a stable island by itself.

If you already have grid-tied solar and you want outage coverage, the usual next question is how to add batteries or a hybrid inverter, or whether a generator and a transfer switch or interlock is the better first step. That retrofit is covered in grid-tie solar with battery backup. For a clear comparison of batteries and generators as backup, see battery backup vs generator.

The three DIY paths

People often mash three different systems into the word “solar.” They are not interchangeable.

Grid-tie (utility-connected, no backup)

A grid-tied system sends power to your house when the sun is up and, where the utility allows it, exports what’s left under an interconnection agreement. There is usually no battery. The goal is bill offset, not outage coverage.

It needs a permit, a licensed electrician and/or inspection, and utility interconnection approval before it is turned on. Rules vary by jurisdiction and utility. This guide does not explain how to skip those steps, and a small system or a “zero-export” setting is not a substitute for approval.

Off-grid (no utility at the site)

An off-grid system has no utility to fall back on. The load list, the battery bank, and the array have to cover ordinary days and a stretch of poor sun — or a generator has to fill the gap. This is a sizing and budget problem, not a lifestyle slogan. “Just move off-grid and figure it out later” is how people end up with a 12-volt starter kit that cannot run a well pump.

Local code, permits, and inspection often still apply even when there is no utility interconnection. Fusing, wire size, and DC-rated overcurrent devices matter here as much as they do on a house that is tied to the grid.

Hybrid (grid-tie with battery backup)

A hybrid system keeps the utility for ordinary days and adds batteries plus a hybrid or islanding-capable inverter (and a way to isolate critical circuits). When the grid is up, it can offset the bill, subject to the same permit and interconnection rules as grid-tie. When the grid drops, selected loads — a critical-load panel, not automatically the whole house — can keep running from the battery, and from the array once the system has isolated.

Adding a battery or a gateway to an existing grid-tied system often means an amended interconnection, not a silent add-on. Plan on talking to the utility and the building department before you buy the hardware.

Decision table

Use this as a chooser, not as a scorecard. “Best” depends on whether you have a utility, whether an outage has to be survivable, and what you are willing to permit and inspect.

QuestionGrid-tieHybrid (grid-tie + battery)Off-grid
Is there a utility at the site?YesYesNo
Does the solar stay on in a utility outage?No. A standard grid-tied inverter shuts down (anti-islanding).Yes, for the loads on the backup or critical-load panel, if the system is designed and listed to island.Not applicable — there is no utility to lose. The battery and array (and often a generator) are the power system.
Main jobOffset the electric bill when the grid is upBill offset and outage coverage for chosen loadsPower the site every day, including cloudy stretches
Permit, inspection, interconnectionYes: permit, licensed electrician and/or inspection, and utility interconnection approval before turn-onYes, including an interconnection amendment if you add a battery or gateway to a system that already existsLocal code, permits, and inspection often still apply; there is no utility interconnection, but this is not a “no rules” path
Typical next stepA sourced payback worksheet, then the permit and interconnection pathA critical-load list and a hybrid / existing-system guideA load audit and an off-grid sizing worksheet

A portable power station can cover a few quiet hours of plug-in loads without any of these three systems. It is a useful Layer-1 tool. It is not a substitute for a permitted hybrid or a sized off-grid system.

How to choose: three worked examples

The loads and watt-hours below are illustrative planning examples, in the same spirit as our critical load worksheet. They are not a product pick, a national average, or a promise of runtime. Use your own nameplates and a meter where you can.

Example A — A house on a reliable grid, mainly trying to cut the bill

The utility is up almost all of the time. An outage is inconvenient, not a reason to redesign the house. The job is bill offset.

Path: grid-tie, with a permit, a licensed electrician, and interconnection approval. If you also want the fridge and the router to stay on in an outage, you are no longer in this example — you have moved to Example B.

What this example does not do: it does not invent a payback period. Installed cost, production, and what your utility pays (or charges) for export vary too much for a made-up number to help you. For context only, the U.S. Energy Information Administration’s Electric Power Monthly, Table 5.6.A, shows a U.S. residential average of 18.16 cents per kWh for August 2026 (preliminary; released October 23, 2026; table re-checked November 20, 2026). State averages in that same table range much higher and much lower, so a national average is a starting point, not your bill. A later guide in this series will walk through payback with NREL PVWatts production, EIA or your published tariff, and a fresh check of the federal Residential Clean Energy Credit (25D). As of November 20, 2026, that credit is not available for installations completed after December 31, 2025. See also battery backup vs generator for the 2026 incentive reality.

Example B — A house that already has, or wants, solar, and also needs outage coverage

The grid is usually up, but you care what happens when it is not. You want the refrigerator, modem, some lights, and maybe a furnace blower or a well pump to keep running.

Start with a critical load list, then size backup hours from usable battery capacity — not from a carton claim.

Illustrative load slice (averages while those loads are “on the plan,” not nameplate running watts):

LoadAssumed average wattsNotes
Refrigerator (duty-cycled)60Compressors cycle; average is far below nameplate
Modem + router20Always on
LED lights (two rooms)40Not the whole house
Combined average draw120 WBefore inverter loss

If you want those loads for about 12 hours with no sun, a rough planning energy need is 120 W × 12 h = 1,440 Wh, plus inverter and depth-of-discharge margin. Using a 10% inverter-and-wiring loss as a labeled planning assumption (not a measured result), 1,440 Wh ÷ 0.90 ≈ 1,600 Wh of usable battery. That is a planning sketch, not a shopping cart.

A well pump or a space heater changes the picture. Those are surge-and-energy problems; run them through the generator sizing guide and the critical-load worksheet before you decide a battery is enough.

Path: hybrid — grid-tie for ordinary days, batteries and a listed isolation device for the outage. If you already have a grid-tied array, adding storage is a design and interconnection change, not a weekend accessory. A generator on a proper transfer switch or interlock can be the cheaper way to cover a long outage; that is a hybrid plan, not a compromise. Our grid-tie solar with battery backup guide covers adding batteries to a system you already have. A later guide in this series covers using solar and a generator together.

Example C — A cabin or workshop with no utility

There is no bill to offset and no grid to island from. The system has to cover the day’s loads and a stretch of poor sun, or a generator has to start.

Path: off-grid. Do the math before you buy panels: load audit, then battery (days of autonomy and usable capacity), then inverter (running and surge), then the array for the worst month, not the best week of June. Our off-grid sizing guide walks that order, including 12-volt vs 24-volt vs 48-volt and how much to oversize for winter. If a well pump is in the plan, treat starting watts as a first-class input, not a footnote.

Off-grid is realistic when the loads, the budget, and the backup plan (often a generator) are honest. It is not realistic as a vague “we’ll just live off the sun” decision. Local code may still apply.

A warning, not a fourth path

Some listings and forum posts describe plug-in or “balcony” inverters, or a grid-tied setup with no interconnection agreement, as a way to start small. That is not a path we teach.

A device that can send power back through a wall outlet, or that keeps running when the grid is down, can energize house wiring and, in the worst case, a utility line. That is a safety problem (anti-islanding is there for a reason), a permit and interconnection problem, and potentially an insurance problem. Rules vary by utility and jurisdiction. If that idea is on your list, set it down. The lawful versions of “starting small” are: a portable power station that does not backfeed the panel; a permitted, inspected, interconnected grid-tie or hybrid system; or a properly built off-grid system that is not tied to the utility.

Safety and code

Requirements vary by jurisdiction and by the authority having jurisdiction (AHJ). This page is educational. It is not legal, code, or insurance advice.

  • Grid-tie and hybrid systems that can export or interconnect need a permit, a licensed electrician and/or inspection, and utility interconnection approval before they are turned on. Do not skip the permit. Do not treat “zero export” or a small system as a way to avoid the utility.
  • Rooftop PV is subject to rapid-shutdown rules under the National Electrical Code edition your AHJ enforces. Use listed, labeled disconnects, properly rated for the circuit (including DC where the circuit is DC).
  • Batteries have their own placement, temperature, and fire-safety rules. A later guide in this series covers listing (UL 1973, UL 9540, and UL 9540A as a test method), labels vs. directory listings, and outdoor installation. Do not install unlisted batteries after an inspection as a workaround.
  • Off-grid is not automatically exempt from local code. Fusing, wire sizing, and DC-rated overcurrent devices still matter. An AC breaker is not a substitute on a DC circuit.
  • If a generator is in the plan, keep it outdoors and away from openings, and use a proper transfer path. See transfer switch vs interlock and generator placement and carbon monoxide.

How we pick products

We show UL-, ETL- (Intertek), or CSA-listed equipment first. Those labs are OSHA-recognized NRTLs, and a listing to the same UL standard counts equally regardless of which of them issued it. Country of origin does not change the rule: a listed import is listed; an unlisted one is not. We verify the exact model in UL Product iQ, the Intertek directory, or a certificate — not from a seller’s product page. If we show a product that is not listed, we say so next to it.

This guide does not name product models. No model will be named until that listing has been verified by hand.

If we later show a product that is not listed, it will carry this note immediately beside it:

Not UL/NRTL listed. We have not confirmed a current UL, ETL (Intertek), or CSA listing for this exact model in UL Product iQ, the Intertek directory, or a certificate. Unlisted equipment may fail a permit or inspection, may not be accepted for utility interconnection, and may affect an insurance claim if something goes wrong. Rules vary by jurisdiction, utility, and insurer — check with your AHJ, utility, and insurer before you buy or install.

Where to look

Supplier links on this page are ordinary editorial links. We do not earn a commission if you buy, and no brand paid to be listed. We list suppliers that publish prices, have a documented US support and warranty policy, and meet our independent review bar on the last check date — or we list them with a “Rating not yet confirmed” note when the rating has not been confirmed first-hand. We re-check the list each quarter. If we later sign an affiliate or sponsorship agreement, those links will be labeled on the page and will use rel="sponsored".

These are companies and catalogs, not product recommendations. No models are named here.

  • Signature Solar — Kit seller with a public US catalog of off-grid and hybrid kits, panels, inverters, batteries, and balance-of-system parts, and US-based support. BBB A+ (accredited); 256 customer reviews on the BBB profile we checked on November 17, 2026.
  • Shop Solar Kits — Kit seller with a public catalog of complete off-grid, hybrid, and backup kits, plus components, and US phone support. BBB A+ (not accredited); 26 customer reviews on the BBB profile we checked on November 17, 2026.
  • SanTan Solar — Kit seller with a public catalog that includes new and used panels, kits, inverters, and batteries, based in Gilbert, Arizona. BBB A+ (accredited); 3 customer reviews on the BBB profile we checked on November 17, 2026 (a thin review count, which is why we report the number). Used or discounted panels are not assumed to be listed — that check has to be done on the exact model.
  • EnergySage — A marketplace for comparing installer quotes on grid-tie and storage projects, not a parts cart. BBB A- (accredited) on the profile we checked on November 17, 2026.
  • altE Store — Kit seller with a public catalog of DIY solar and storage kits and components, and a published warranty policy. Rating not yet confirmed. We have not independently confirmed a BBB, Trustpilot, or Google rating first-hand as of November 17, 2026.

Nobody from this site has contacted these companies about this list.

FAQ

These questions are ones homeowners actually ask — several as real thread titles in r/solar, r/SolarDIY, and r/OffGrid. Short answers only; the sections above carry the detail.

Is it true that home solar panel setups connected to the house electrical are useless in a power outage?

A standard grid-tied system will not power the house when the utility is down. That shutdown is anti-islanding, and it is required. The panels are still doing their job on ordinary days. They become backup only if you add isolation and a grid-forming source, usually batteries (a hybrid system), sometimes with a generator.

Where do I start?

Write down what you need the system to do: cut the bill, cover an outage, or power a site with no utility. Then build a load list with the critical load worksheet. Do not start by buying panels.

Just bought a house with solar. Should I, and how do I, add batteries?

Often yes if you want outage coverage, because many existing grid-tied systems shut down when the grid does. Adding batteries or a hybrid inverter is a design change and often an interconnection amendment. See grid-tie solar with battery backup for that path. A generator on a proper transfer device can be a simpler backup while you plan the battery side.

Is solar really worth it? How do I calculate payback?

It depends on your tariff, your production, and what (if any) incentives still apply where you are. We will not invent a years-to-payback figure here. A later guide in this series will run that math with PVWatts, EIA or your published rate, and a fresh IRS 25D check. As of November 20, 2026, the federal 25D credit is not available for installations completed after December 31, 2025.

What if I install solar with no permit?

Don’t. Grid-tie and hybrid work that interconnects with the utility needs a permit, inspection, and interconnection approval. This site covers how to get those approvals, not how to skip them. Requirements vary by jurisdiction.

Will I get in trouble for plugging an inverter into a wall outlet?

We don’t teach that setup. A plug-in or “balcony” inverter that can backfeed a receptacle can energize wiring — and possibly a utility line — in an unsafe way. Use a portable power station that does not backfeed, or a permitted, inspected system.

At what point does it make sense to move from 12V to 24V or 48V?

When cable size, current, and headroom to grow start to work against a 12-volt bank — which happens sooner than many first kits suggest. That decision belongs in the off-grid sizing guide, not in this chooser.

Once the batteries are no longer the problem, what becomes the weak point?

Usually a long stretch of poor sun, or the cost of enough storage to ride it out. A generator with a sane fuel plan is often the next piece. That is a later guide, and it pairs with our winter generator fuel and maintenance calendar pages.

Next step

Later in this series: a sourced payback worksheet; permits and interconnection; a worked cabin or workshop example; battery listing and placement; wiring and fusing; solar and a generator as one plan.

About the author

Gregg Jahn created BuyAGenerator after storms kept knocking out power at his North Carolina home. He runs a DuraStar 13kW multi-fuel generator with a manual cutover switch, plus EcoWorthy battery banks, propane generators and solar panels, including a small houseboat setup with Victron controllers. About Gregg · Editorial policy