Quick answer
Do not start by buying panels. Write a load list in watt-hours per day, then size the battery (days of autonomy and usable depth of discharge), then the inverter (running and surge watts), then the array for the worst month of sun — not the best week of June — and only then the charge controller and how the panels are strung. A 12-volt bank is for small, short-cable systems. A cabin or workshop that runs a well pump or a 2,000-watt-class inverter usually belongs on 24 or 48 volts, because current, and therefore wire size, climbs fast at 12 volts. Oversizing for winter is not one magic multiplier: you can add array, add battery, add a generator, or combine the three. Off-grid is not a “no rules” path. Local code, permits, and inspection often still apply.
This is the sizing guide in our DIY solar series. It is a worksheet with one fully worked example. It is not a wiring manual, a permit-skip, or a product list.
Do the math in this order
People often ask “how do you do the math?” and then start with a panel wattage. That is backwards. An off-grid system has no utility to cover a miss, so the load list has to come first.
- Load audit — every load you intend to run, in watt-hours per day, plus which of those loads can run at the same time and what their starting (surge) watts are. Use the critical load worksheet. Meter what you can; nameplates and a duty-cycle estimate for the rest. Label estimates as estimates.
- Battery — usable energy, not the number printed on the carton. That means days of autonomy and the depth of discharge you will actually use, from the battery’s own ratings.
- Inverter — continuous running watts for the loads that can be on together, and surge watts for motors (a well pump, a fridge compressor, a shop tool). The generator sizing guide walks running vs. surge, and the same inputs apply here.
- Array — sized to replace a day’s energy in the worst month of sun at your site, using a sourced solar-resource figure, not a national average and not June.
- Charge controller and stringing — the array has to stay inside the controller’s (or hybrid inverter’s) voltage and current limits, including the open-circuit voltage on a cold morning.
A later guide in this series will work a full cabin or workshop build in more detail, using the same sizing method.
Step 1 — Daily load in watt-hours
List each load, its average watts while it is in the plan, and how many hours it runs in a day. Average watts for a cycling load, such as a refrigerator, are far below the nameplate running watts. Surge watts do not go in the daily energy column; they go to the inverter step.
Daily energy (Wh) = average watts × hours per day, then added up.
That total is the energy the system must supply on an ordinary day, before inverter, battery, and wiring losses. If a well pump, a space heater, or a shop tool is on the list, treat it as a first-class input, not a footnote. If you are not sure a load belongs on the off-grid panel, it probably does not, until you have done the math.
Step 2 — Battery capacity and days of autonomy
Two numbers decide the bank:
- Days of autonomy — how many days of your daily load you want to cover with little or no sun, before a generator (or a change in how you use the site) has to fill the gap. This is a design choice, not a universal rule. Two days is a common planning starting point for a cabin or workshop that also has a generator. Three or more days buys a longer cloudy stretch and a larger, more expensive bank.
- Usable depth of discharge (DoD) — the fraction of the nameplate watt-hours you will actually use. Follow the battery manufacturer’s usable-capacity rating. As labeled planning assumptions, not measured results and not a product pick: many lead-acid banks are planned at about 50% DoD; many lithium iron phosphate banks are planned at about 80% DoD. Use the datasheet if you have it. Cold weather can reduce usable capacity further; use the manufacturer’s temperature data rather than a guess.
Usable energy needed (Wh) = daily energy after inverter loss × days of autonomy
Nameplate energy (Wh) = usable energy needed ÷ planned DoD
Example of the inverter-loss step, using the same 10% inverter-and-wiring planning assumption as in our chooser guide (a labeled assumption, not a lab measurement): if the AC loads are 2,720 Wh/day, the battery must deliver 2,720 ÷ 0.90 ≈ 3,022 Wh per day.
Step 3 — Inverter running and surge
Daily watt-hours size the battery and the array. They do not size the inverter. The inverter has to cover the watts that can be on at once, and the starting surge of any motor.
Use nameplates and, for motors, locked-rotor or starting-watt figures when you have them. The generator sizing guide is the place for that running-vs-surge arithmetic. A refrigerator’s daily average may be 60 W; the compressor’s running and starting watts are higher, and they matter when the well pump starts at the same time.
Step 4 — Array size from worst-month sun
Peak sun hours are the day’s plane-of-array solar energy, in kWh per square meter, which is also kWh per kW of array at 1,000 W/m². A 4.0 peak-sun-hour day is not “four hours of sun.” It is the equivalent of four hours at full irradiance, spread across the real day.
For off-grid work, use the worst month, usually December in the northern United States, not the annual average.
Get the figure from NREL PVWatts (or the National Solar Radiation Database behind it) for your location, tilt, and azimuth. Write down the run date, the weather-data source, and the inputs. A national “5 sun hours” rule of thumb is not a source.
Then walk the energy backwards from the AC loads to the array, with each efficiency labeled as a planning assumption:
- Start with daily AC watt-hours.
- Divide by inverter-and-wiring efficiency to get watt-hours that must leave the battery.
- Divide by battery round-trip efficiency to get watt-hours that must enter the battery.
- Divide by charge-controller and array-wiring efficiency to get watt-hours the array must produce.
- Divide by that month’s peak sun hours. The result is the array size, in watts.
In the worked example below we use 90% inverter-and-wiring, 90% battery round-trip, and 95% charge-controller and array-wiring — all labeled planning assumptions. Substitute datasheet values when you have them.
A steeper winter-biased tilt (often around latitude + 15°) can raise December sun hours at the expense of summer. Run both tilts in PVWatts before you lock a rack angle.
Step 5 — Charge controller, then string the panels
The controller (or the PV input on a hybrid inverter) has a maximum input voltage, a maximum input current, and an MPPT operating window. The array has to fit on the coldest morning and still work on a hot afternoon.
The usual limit that catches people is open-circuit voltage (Voc) in the cold. Panel Voc is published at 25°C. Voltage rises as the cells get colder. A string that looks safe at room temperature can exceed the controller’s maximum Voc on a clear, cold morning and damage the unit.
Use the temperature coefficient on the panel datasheet, and a lowest-expected ambient temperature for the site (the authority having jurisdiction may point you at ASHRAE design data or another local source). A planning form of the correction is:
Voc at cold = Voc at 25°C × [1 + (Voc temperature coefficient × (T_min − 25°C))]
If the coefficient is given in %/°C, convert it first (for example, −0.27%/°C is −0.0027 per °C). If you do not have a coefficient, the National Electrical Code section 690.7, in the edition your AHJ enforces, describes how to correct maximum voltage, including a table of factors when a coefficient is not available. This page is not a substitute for that code or for the equipment manual.
Also check short-circuit current (Isc) and the number of parallel strings against the controller’s current limit, and size conductors and DC-rated overcurrent devices from the manual and from NEC 690.8 and 690.9 as your AHJ enforces them. An AC breaker is not a substitute on a DC circuit. A later wiring guide in this series covers wire size and fusing in detail.
Worked example — a workshop cabin near Asheville, North Carolina
The loads, hours, and efficiencies below are illustrative planning examples, in the same spirit as our critical load worksheet. They are not this site’s measured use, a product pick, or a promise of runtime. The solar resource is real: it comes from a PVWatts run for a named location, cited at the end of this section. Use your own nameplates, a meter where you can, and a PVWatts run for your address.
The site: a small workshop cabin with no utility, in the mountains near Asheville, North Carolina. The job is to cover a modest daily load through winter, with a generator in reserve for a long stretch of poor sun.
Illustrative daily load
| Load | Assumed average watts | Hours/day | Wh/day | Notes |
|---|---|---|---|---|
| LED lights (a few rooms) | 40 | 5 | 200 | Not the whole building |
| Refrigerator (duty-cycled) | 60 | 24 | 1,440 | Average is far below nameplate; same planning figure as in the chooser |
| Modem + router | 20 | 24 | 480 | Always on |
| Laptop / device charging | 50 | 4 | 200 | |
| Well or pressure pump | 800 (running, intermittent) | 0.5 | 400 | Starting watts are a separate inverter input; use the nameplate |
| Daily AC energy | 2,720 | Before conversion losses |
Inverter (planning sketch). Daily energy does not size this inverter. If the pump can start while lights, always-on loads, and a fridge compressor are on, you need nameplate running and starting watts for that coincidence — see the generator sizing guide. For this example, a 2,000-watt-class inverter is the kind of size those loads point at. That is a sketch, not a shopping cart. Confirm it with the actual nameplates and surge figures.
Battery. Daily energy that must leave the battery, at a 10% inverter-and-wiring planning loss: 2,720 ÷ 0.90 ≈ 3,022 Wh/day.
Choose 2 days of autonomy as a planning starting point, with a generator for a longer slump: 3,022 × 2 ≈ 6,044 Wh usable.
- At a 50% DoD planning assumption (typical lead-acid planning, not a brand claim): 6,044 ÷ 0.50 ≈ 12,088 Wh nameplate, about 12.1 kWh.
- At an 80% DoD planning assumption (typical lithium iron phosphate planning, not a brand claim): 6,044 ÷ 0.80 ≈ 7,555 Wh nameplate, about 7.6 kWh.
Array — solar resource from PVWatts. On November 20, 2026 (America/New_York) we ran NREL PVWatts Version 8 (API 8.5.0) for Asheville, North Carolina (requested 35.5951°N, 82.5515°W). The weather file was NSRDB PSM V3 GOES tmy-2020 3.2.0, at a grid cell at 35.61°N, 82.54°W, elevation 726 m, about 2 km from the requested point. Inputs: 1 kW nameplate, standard module, 14% PVWatts default system losses, fixed open rack, true-south azimuth (180°). We ran two tilts: 35.6° (site latitude) and 50° (a winter-biased angle).
Daily plane-of-array irradiance — the peak sun hours we use for off-grid array sizing — was:
| Month | Peak sun hours at 35.6° tilt (kWh/m²/day) | Peak sun hours at 50° tilt (kWh/m²/day) |
|---|---|---|
| January | 4.24 | 4.47 |
| February | 5.02 | 5.13 |
| March | 5.14 | 4.94 |
| April | 5.82 | 5.30 |
| May | 5.83 | 5.07 |
| June | 5.65 | 4.79 |
| July | 5.67 | 4.86 |
| August | 5.82 | 5.22 |
| September | 5.52 | 5.23 |
| October | 5.25 | 5.28 |
| November | 4.56 | 4.78 |
| December | 3.97 | 4.25 |
| Annual average | 5.21 | 4.94 |
December is the worst month at both tilts. A steeper 50° tilt raises December sun hours from 3.97 to 4.25 and January from 4.24 to 4.47, and it lowers the annual average. A shallow tilt goes the other way: a 20° run on the same file dropped December to 3.41 peak sun hours.
PVWatts also reports AC energy for a grid-tied inverter model (default 96% inverter efficiency and a 1.2 DC/AC ratio). That is useful context, but it is not the off-grid charge path. At 35.6° tilt, that model produced 99.1 kWh in December and 1,427 kWh over the year, per kW of array. We do not use those AC kilowatt-hours to size the off-grid array.
Array — the arithmetic. Watt-hours the array must produce on an average December day, using the labeled efficiencies above:
- 2,720 Wh AC ÷ 0.90 inverter ≈ 3,022 Wh out of the battery
- 3,022 ÷ 0.90 battery round-trip ≈ 3,358 Wh into the battery
- 3,358 ÷ 0.95 charge-controller and array wiring ≈ 3,535 Wh from the array
Array size at latitude tilt: 3,535 Wh ÷ 3.97 peak sun hours ≈ 890 W.
Array size at 50° tilt: 3,535 Wh ÷ 4.25 peak sun hours ≈ 830 W.
So this example points at roughly a 900-watt-class array if the rack is set near latitude, or a little less if the rack is steeper for winter. That covers an average December day in this weather file. It does not, by itself, cover the darker days in the same file. That is the next section.
What this example points at (not a parts cart, and no models): a 48-volt battery bank in the neighborhood of 7.6 kWh nameplate (lithium planning) or 12.1 kWh (lead-acid planning); a 2,000-watt-class inverter pending nameplate surge; a 900-watt-class array; an MPPT controller whose cold-Voc and current limits fit the string; DC-rated fusing and disconnects; and a generator in reserve. No prices, and no model names, until a UL, ETL, or CSA listing is verified by hand.
12V vs 24V vs 48V
A frequent question is, “At what point does it make sense to move from 12V to 24V or 48V?” The useful answer is about current, not a folklore wattage cutoff.
Power is voltage times current. For the same load, raising the system voltage cuts the current in the same proportion, and lower current means smaller cable, less voltage drop, and less heat. A 2,000 W inverter draw (the class of inverter this example points at) is, before inverter loss:
| System voltage | Current at 2,000 W |
|---|---|
| 12 V | about 167 A |
| 24 V | about 83 A |
| 48 V | about 42 A |
A 167-amp path needs very heavy cable even on a short run. A 42-amp path is in a different wiring world. Long cable runs make the gap wider: voltage drop scales with current and with length, which is why a 12-volt system that looks fine on a bench can disappoint at the end of a 75-foot run.
Decision table
Use this as a chooser for system voltage, not as a scorecard. The current column is the one to take seriously.
| Question | 12 V | 24 V | 48 V |
|---|---|---|---|
| What is it a good fit for? | Small, short-cable systems — a few hundred watts, a short run, limited growth | A mid-size bank when 12 V current is already uncomfortable and 48 V equipment is not the plan | Most cabin and workshop systems in the kilowatt range, including this example |
| Current at a 2,000 W inverter draw | About 167 A | About 83 A | About 42 A |
| Wiring and voltage drop | Heavy cable; drop shows up fast as the run gets longer | More manageable | Smaller cable for the same power; more headroom on a long run |
| Room to grow | Runs out of headroom quickly | Better than 12 V, still tighter than 48 V | The easiest of the three to add array or loads later |
| This 2,720 Wh/day workshop-cabin example | Poor fit | Possible, if you accept heavier cable | Best fit |
Stay at 12 volts only when the current math still looks sane for the cable length you actually have. For this worked example, 48 volts is the rational choice. Mix-and-match banks (a 12-volt starter kit later “converted”) are how people end up buying the system twice.
How much to oversize for winter and cloudy weather
“How much do you actually oversize an off-grid solar system for cloudy weather?” is a real question, and it does not have a single multiplier.
The 890 W array above is already a winter-sized array: it was built from December’s average sun, not from June. That is the first kind of oversize, and it is the right kind. A second kind — multiplying the array again by 1.3 or 1.5 “for clouds” — helps on a dim-but-not-dark day and does almost nothing on a day with almost no sun. The battery and, for a long slump, a generator have to do that job.
The same PVWatts weather file makes this concrete. PVWatts hourly AC output is a grid-tied inverter model, so treat the following as a picture of resource variability, not as this cabin’s exact off-grid harvest. For a 1 kW array at 35.6° tilt, in this TMY-2020 year:
- An average December day produced 3.20 kWh.
- The darkest December day produced 0.37 kWh. Six December days produced less than 1 kWh.
- The darkest two-day stretch in the year was January 27–28, totaling 0.91 kWh (about 0.45 kWh per day).
- The 10th-percentile December day was about 0.51 kWh.
A typical meteorological year is a typical year, not the worst year you will ever see, and your site is not this grid cell. Even so, the pattern is the point. On the darkest December day in this file, an 890 W array scaled in proportion would produce on the order of 0.33 kWh, against a 2,720 Wh load. The battery has to cover almost a full day. On that two-day January stretch, the same 890 W array would produce on the order of 0.8 kWh over two days, against about 5.4 kWh of loads. Two days of usable battery, if the bank started full, is in the right neighborhood for that slump. A longer slump, a bank that was not full, or a colder, darker year is why a generator belongs in the plan.
You have three levers. Use them as a set, not as rivals.
| Lever | What it does well | What it does not do |
|---|---|---|
| More or steeper array | Covers the winter average and helps on partly cloudy days; a steeper tilt can raise December sun hours (in this run, 3.97 → 4.25) | Cannot turn a 0.37 kWh/kW day into a full load day at any reasonable oversize |
| More battery (more days of autonomy) | Bridges a night, a dark day, and a short cloudy stretch | Gets expensive if you try to store a week of poor sun with no other backup |
| A generator with a fuel plan | Covers a long stretch of poor sun without building a huge bank | Is not a substitute for sizing the solar for ordinary winter days, and it has to be installed and used safely |
A portable power station can cover a few quiet hours of plug-in loads. It is not a substitute for a sized off-grid bank. For a longer comparison of batteries and generators as backup, see battery backup vs generator. Fuel in the cold is its own problem; see winter generator fuel. A later guide in this series treats solar and a generator as one plan.
How many panels can you put on the controller or inverter?
“Confused about number of panels I can use” is, in practice, a stringing question: series voltage, parallel current, and the cold-weather Voc rule, checked against the equipment manual.
No product model is named here. The numbers below are a labeled planning example so you can see the arithmetic. Replace them with the datasheet for the panel you actually have, and with the maximum Voc, MPPT window, and current limits in the controller or inverter manual.
Example panel nameplate (not a model): 400 W class, Voc 49.0 V at 25°C, Isc 11.0 A, Voc temperature coefficient −0.27%/°C.
Lowest-expected cold, for this example only. In the same NSRDB tmy-2020 file used for the PVWatts run, the dry-bulb temperature reached −15°C (5°F), on January 16 in that file. For context, the 2021 ASHRAE Handbook — Fundamentals lists a 99.6% heating dry-bulb of 14.9°F (−9.5°C) for Asheville. Mountain sites can be colder than the airport, and the authority having jurisdiction may require a specific design temperature. This example uses −15°C as a conservative planning low from the same weather file. Use the lowest expected ambient for your site.
Voc at −15°C = 49.0 × [1 + (−0.0027 × (−15 − 25))] = 49.0 × 1.108 ≈ 54.3 V per panel.
| Panels in series | Cold string Voc at −15°C |
|---|---|
| 2 | about 108.6 V |
| 3 | about 162.9 V |
| 4 | about 217.2 V |
| 5 | about 271.5 V |
If the controller’s maximum input voltage were 150 V (an example limit, not a model), three in series would be over the limit on a cold morning; two would fit with margin. If the limit were 250 V, four in series would fit and five would not. The room-temperature math (3 × 49.0 = 147 V) would have wrongly suggested that three panels were safe on a 150 V input. That is the cold-weather rule.
Then check the other side of the window. Cell temperature in the same weather file reached 71°C. Heat lowers Vmp and can drop a string below the MPPT minimum. Use the Vmp coefficient on the datasheet and the manual’s operating window; do not string to the Voc ceiling and ignore the floor.
For current: add Isc for each parallel string and compare it to the controller’s short-circuit and charging-current limits. Conductor and fuse sizing follow the manual and NEC 690.8 and 690.9 as your AHJ enforces them, with DC-rated overcurrent devices. Do not copy an AC breaker into a DC combiner and call it done.
If the array watts you need do not fit on one controller after these checks, you need another controller (or a different PV-input window), not a string that exceeds the limit.
Wire size and fusing (short, on purpose)
A full cable and fuse worksheet belongs in a later wiring guide in this series. Two rules are worth stating here because they affect the sizing choices above.
- Voltage drop is why 12 volts runs out of road. Drop scales with current and with length. Size the voltage first, then the cable, not the other way around. “Calculating wire gauge” without a voltage, a current, and a one-way length is not a complete question.
- DC circuits need DC-rated fuses or breakers and listed, labeled disconnects. An AC-only breaker is not a substitute. Place overcurrent protection where the manual and the code, as enforced by your AHJ, require it. This is not a do-it-yourself substitute for a licensed electrician.
A generator for long cloudy stretches
Once the batteries are no longer the weak point, a long stretch of poor sun usually is — or the cost of enough storage to ride it out with no other backup. A generator with a sane fuel plan is often the next piece, not a failure of the solar design.
Size the generator from the same running and surge watts you used for the inverter, plus whatever you need to recharge the bank, using the generator sizing guide. Keep the generator outdoors and away from openings; see generator placement and carbon monoxide. If it will serve house circuits, use a proper transfer path — a listed transfer switch or interlock — not a backfeed or a “suicide” hookup. Winter fuel handling is covered in winter generator fuel.
A later guide in this series covers using solar and a generator as one plan. This page only needs you to leave room in the design for that generator, rather than pretending the array will invent sun that is not there.
Safety and code
Requirements vary by jurisdiction and by the authority having jurisdiction (AHJ). This page is educational. It is not legal, code, or insurance advice.
- Off-grid is not automatically exempt from local code. Permits and inspection often still apply even when there is no utility interconnection. This site covers how to get those approvals, not how to skip them.
- Use listed, labeled disconnects, properly rated for the circuit — including DC where the circuit is DC. Size overcurrent protection from the equipment manual and from NEC 690.8 and 690.9 in the edition your AHJ enforces. An AC breaker is not a substitute on a DC circuit.
- Batteries have placement, temperature, and fire-safety rules. A later guide in this series covers listing (UL 1973, UL 9540, and UL 9540A as a test method), labels vs. directory listings, and outdoor installation. Do not install unlisted batteries after an inspection as a workaround. A battery management system and listed disconnects are part of a safe install, not extras.
- Rooftop PV, if that is how the array is mounted, is subject to rapid-shutdown rules under the NEC edition your AHJ enforces.
- If a generator is in the plan, keep it outdoors and away from openings, and use a proper transfer path. See transfer switch vs interlock and generator placement and carbon monoxide.
- Plug-in or “balcony” inverters, and any hookup that can backfeed a receptacle or a utility line, are not a path we teach. They are a safety warning only.
How we pick products
We show UL-, ETL- (Intertek), or CSA-listed equipment first. Those labs are OSHA-recognized NRTLs, and a listing to the same UL standard counts equally regardless of which of them issued it. Country of origin does not change the rule: a listed import is listed; an unlisted one is not. We verify the exact model in UL Product iQ, the Intertek directory, or a certificate — not from a seller’s product page. If we show a product that is not listed, we say so next to it.
This guide does not name product models. No model will be named until that listing has been verified by hand.
If we later show a product that is not listed, it will carry this note immediately beside it:
Where to look
Supplier links on this page are ordinary editorial links. We do not earn a commission if you buy, and no brand paid to be listed. We list suppliers that publish prices, have a documented US support and warranty policy, and meet our independent review bar on the last check date — or we list them with a “Rating not yet confirmed” note when the rating has not been confirmed first-hand. We re-check the list each quarter. If we later sign an affiliate or sponsorship agreement, those links will be labeled on the page and will use rel="sponsored".
These are companies and catalogs, not product recommendations. No models are named here. Official manuals and a dealer locator are the right first stop for component limits (Voc, current, and temperature).
- Signature Solar — Kit seller with a public US catalog of off-grid and hybrid kits, panels, inverters, batteries, and balance-of-system parts, and US-based support. BBB A+ (accredited); 256 customer reviews on the BBB profile we checked on November 17, 2026.
- SanTan Solar — Kit seller with a public catalog that includes new and used panels, kits, inverters, and batteries, based in Gilbert, Arizona. BBB A+ (accredited); 3 customer reviews on the BBB profile we checked on November 17, 2026 (a thin review count, which is why we report the number). Used or discounted panels are not assumed to be listed — that check has to be done on the exact model.
- altE Store — Kit seller with a public catalog of DIY solar and storage kits and components, and a published warranty policy. Rating not yet confirmed. We have not independently confirmed a BBB, Trustpilot, or Google rating first-hand as of November 17, 2026.
- Renogy — Component maker with a public US catalog of panels, charge controllers, inverters, batteries, and kits. Rating not yet confirmed. We have not independently confirmed a BBB, Trustpilot, or Google rating first-hand as of November 17, 2026.
- Victron Energy — Component maker of inverters/chargers, MPPT charge controllers, and monitoring, sold through authorized dealers, not a single official US cart we verified. Rating not yet confirmed. We have not independently confirmed a BBB, Trustpilot, or Google rating first-hand as of November 17, 2026. Prefer the official manuals and the dealer locator until a first-hand rating is recorded.
Nobody from this site has contacted these companies about this list.
FAQ
These questions are ones homeowners actually ask — several as real thread titles in r/solar, r/SolarDIY, and r/OffGrid. Short answers only; the sections above carry the detail.
How do you do the math?
In this order: a load list in watt-hours per day, then usable battery (autonomy × depth of discharge), then inverter running and surge, then the array from worst-month peak sun hours, then the controller and cold-weather Voc. Do not start with a panel count. The worked example on this page uses a 2,720 Wh/day planning load and a PVWatts run for Asheville, North Carolina.
At what point does it make sense to move from 12V to 24V or 48V?
When the current — and the cable it demands — stops being sane. A 2,000 W inverter draw is about 167 A at 12 V, 83 A at 24 V, and 42 A at 48 V. Long runs make 12 V worse. The workshop-cabin example on this page belongs on 48 V.
How much do you actually oversize an off-grid solar system for cloudy weather?
Size the array for the worst month’s average sun, not for June, and then use battery days and, for a long slump, a generator. There is no single multiplier. In the Asheville TMY-2020 file we ran, a 1 kW array’s darkest December day was 0.37 kWh against a 3.20 kWh December average. A bigger array helps a dim day; it does not invent sun on a dark one.
Confused about the number of panels I can use?
It is a stringing limit, not a wattage guess. Series Voc, corrected for the coldest expected morning, must stay under the controller or inverter maximum. Parallel Isc must stay under its current limit. Check both against the manuals. A string that looks safe at 25°C can go over-voltage when it is cold.
Calculating wire gauge?
You need the system voltage, the current, and the one-way length before a gauge means anything. Lower voltage means heavier cable. DC circuits need DC-rated fuses or breakers. A later guide in this series is the full wiring worksheet; this page only flags the issue.
Once the batteries are no longer the problem, what becomes the weak point?
Usually a long stretch of poor sun, or the cost of enough storage to ride it out. A generator with a fuel plan is often the next piece. Pair that with our winter generator fuel page and, when it ships, the later solar-and-generator guide.
Help starting out sizing my off-grid power system.
Start with the critical load worksheet, then follow the order on this page. If you do not have a utility at the site, be honest about winter sun and about a generator. Off-grid is a load-and-budget problem, not a slogan.
Do I still need a permit if the cabin is off-grid?
Often yes. Local code, permits, and inspection commonly still apply when there is no utility interconnection. Requirements vary by jurisdiction. This site does not teach a skip.
Next step
- Critical load worksheet — build the must-run list, in watt-hours, before you size a bank or an array.
- Generator sizing guide — running vs. surge watts, including wells and other motors, whether the source is a generator, an inverter, or both.
- Battery backup vs generator — runtime, install, and the 2026 incentive reality (the federal 25D residential credit is not available for installations completed after December 31, 2025).
- Portable power stations vs gas generators — when a station is enough for quiet hours, and when it is not.
- Winter generator fuel — fuel handling if a generator is the poor-sun backup.
- Transfer switch vs interlock — the safe path onto house circuits if a generator is in the plan.
- Does grid-tied solar work in a power outage? — the series chooser for off-grid vs grid-tie vs hybrid.
- Grid-tie solar with battery backup — if the site is on the utility and the job is outage coverage, not a full off-grid system.
Later in this series: a sourced payback worksheet; permits and interconnection; a worked cabin or workshop example; battery listing and placement; wiring and fusing; solar and a generator as one plan.